|
Essay on experience
reports of industrial software product line engineering cases
A number of real industrial cases are provided (chapter 21
textbook). The project groups will be
(randomly) assigned an
industrial case. The case will be presented by one of the group members.
The groups and the allocation of
cases have been defined as follows:
|
Group |
Members |
Selected Case
(Example) |
|
1 |
- Osmancan Çekinmez
- Onur Özdemir
- Burak Karayel |
ABB - Control System Software for Gas Turbine
Family |
|
2 |
- Ayten Göksenin Korkmaz
- Zeynep Çeşmeli
- Mustafa Çavdar |
Boeing – Avionics System |
|
3 |
- E. Bahadır Şahin
- Ural Sezer
- Umutcan Turan |
Bosch - Gasoline Systems
Engine Control Software |
|
4 |
- Batuhan Baykara
- Selin Güldamlasıoğlu
- Havva Gülay Gürbüz |
CelciusTech System AB - ShipSystem 2000 |
|
5 |
- İlker Köksal
- Ekin Öcalan
- Sıla Çakıcı |
Hewlett Packard - Oven Firmware Cooperative |
|
6 |
- Kaan Bingöl
- Mustafa Özkıdık
- Tolga Yılmaz |
LSI Logic - RAID controller firmware product
line |
|
7 |
- Koray Karacakaya
- Halid Yildiz
- Aykut Kadeifci |
Market Maker AG - MERGER Software Product
Line |
|
8 |
- Aslıhan
Kalem
- Dilan Süslü
- Gülsüm Ece Bıçakcı |
Philips - Medical
Systems |
| 9 |
- Sezin Burcu Yildiz
- Nurcan Kucukarslan
- Sema Kamisli |
Philips - Software for Television Sets |
| 10 |
- E. Nihan İçöz
- Selin Gökkuş
- Eda Bitlisli |
Salion - Revenue Acquisition Management
Systems |
| 11 |
- Esat Rıdvan Kavgaoğlu
- Mustafa Kaan Ünlü
|
Siemens AG Medical
Solutions |
| 12 |
- Onur Burç
- Muhammet Erol
- Ahmet Yükseker |
Toshiba - Electric Power Generation Plant
Monitoring and Control |
The allocation of the cases is based
on alphabetical ordering of cases.
Report
Evaluation Criteria
The report will be evaluated based
on the following criteria:
-
Layout: Title page, structure,
style, references, numbering, captions etc.
-
Description of the context -
what kind of organization is considered? what are the developed
products? what are the constraints, etc.?
-
Motivation for adopting
SPLE - what was the business case for
adopting a SPLE approach? What were the expected costs and benefits?
-
Description of the adopted
approach - What was the adopted SPLE approach?
Comparison with SPLE framework.
-
Description of the evaluation -
What was the result of applying SPLE in the organization? What is
the impact on factors such as productivity, reuse, organization
structure, software architecture, development strategy etc?
-
Conclusion - Summary, discussion
and lessons learned
The report should be
around 10 pages long
and adopt the LNCS Springer Conference Proceedings format.
The title page should include the
group number, student names with student ids. In addition a summary
sheet that shows the contribution of each student should be provided.
Presentation
A PowerPoint presentation of the
report needs to be prepared and submitted to the instructor before the
day of presentation. The presentation should be done by one student who
will
get an individual grade.
The
presentation should
not take more than 15 minutes, including questions.
Important Dates
|
March 11, 2013 |
Deliver one
hardcopy + electronic version of project reports
(all groups) |
| March
11, 2013 |
Deliver
presentation to instructor
(all groups) |
| March
11, 2013 |
Presentations
group 1-6
(8:40-10:30) |
| March
13, 2013 |
Presentations
group 7-12 |
|